Evaluation of crest raising methods for the Mazraeh copper mine tailings dam, Ahar, and proposal of an optimal design

Document Type : Research paper

Authors

1 Associate Professor, Department of Earth Sciences, Faculty of Natural Sciences, University of Tabriz, Tabriz, Iran.

2 Professor, Department of Earth Sciences, Faculty of Natural Sciences, University of Tabriz, Tabriz, Iran.

3 Associate Professor, Department of Civil Engineering, Faculty of Engineering, Azerbaijan Shahid Madani University, Tabriz, Iran.

Abstract

Tailings dams are structures used to store tailings from mineral and industrial processing. These dams play a vital role in controlling pollution and reducing the environmental impacts of mining activities. Generally, these dams are not built to their final level all at once and in one stage, but rather, as the extraction process progresses and the resulting tailings are produced, the height of these dams increases in stages. The Mazraeh copper mine tailings dam is a rockfill dam with a reservoir capacity of about 550,000 cubic meters, located in East-Azerbaijan province, 18 kilometers north of Ahar city and on the eastern side of the Shiver intrusive masses. The current level of the tailings dam after first construction and two stages of raising elevation is 2085 (meters above sea level) and about 50 meters above the bed, and the third stage of raising is currently being designed and is under construction to a height of 2095 meters. This dam is built on granite bedrock and the weathering of the rock mass at the surface and along the joints is assessed as low to moderate. The quality index of the rock mass up to a depth of 20 meters from the ground surface is very poor to poor and at greater depths it is moderate to excellent. In this paper, the variants for raising the dam crest level from 2085 to 2095 are examined and then, based on the results obtained and the existing limitations, the proposed option is selected and designed using Slope/W, Sigma/W and Plaxis software. Based on the results obtained, the use of upstream methods is an economical and risky option, the downstream option is uneconomical but safe, and the center-facing option is intermediate. Therefore, due to existing limitations and short-term operation period (about 10 years), the use of a combined method of the 5m centerline followed by 5m upstream method was proposed. The design results showed that the downstream slope in this case needs to be reduced from 1v:1.6h at the current state, to 1v:1.75h. The vertical displacement after the raising completion was estimated to be about 54 to 60 cm. For the closure and abandonment stage of the study tailings dam, it is recommended to reduce the downstream slope of the dam body and ensure that the tailings are consolidated and dried inside the reservoir (to prevent possible liquefaction).

Keywords

Main Subjects


برزگری ق.، مشهدی جعفرلو ر.، ندیری ع.، 1402. بررسی عملکرد سد باطله معدن مس مزرعه اهر از لحاظ پایداری و نشت. هیدروژئولوژی، 8(1)، 156- 169.  
سازمان مدیریت و برنامه­ریزی کشور، 1394. راهنمای طراحی، ساخت و بهره‌برداری از سدهای پسماند. ضابطه شماره682.
شرکت مهندسی مشاور طوس آب، 1397. گزارش نهایی زمین­شناسی و زمین­شناسی مهندسی ترفیع سد باطله مزرعه. شماره گزارش 7781-410481.
شرکت مهندسی مشاور طوس آب، 1397. گزارش لرزه­خیزی، لرزه زمین­ساخت و خطر زمین­لرزه سد باطله مزرعه. شماره گزارش 7771-410481.
شرکت مهندسی مشاور طوس آب، 1398. گزارش طراحی پی و بدنه سد باطله معدن مس مزرعه (ترفیع تا تراز 2085 متر). شماره گزارش 7954-410481.
نبوی م. ح.، 1355. دیباچه­ای بر زمین­شناسی ایران. سازمان زمین شناسی کشور، ص 109.
Alizadeh, P., Latifi, M., 2025. The study of the factors affecting phreatic line position and stability in upstream tailings dams. Results in Engineering, 25, 104092.
Barzegari, G., Mashhadi Jafarloo, R., Nadiri, A., 2023. Investigating the performance of Mazraeh Ahar copper mine tailings dam from stability and seepage aspects. Hydrogeology, 8(1), 156–169. [In persion]
Burritt, R. L., Christ, K. L., 2018. Water risk in mining: Analysis of the Samarco dam failure. Journal of Cleaner Production, 178, 196–205.
Coulibaly, Y., Belem, T., Cheng, L., 2017. Numerical analysis and geophysical monitoring for stability assessment of the Northwest tailings dam at Westwood mine. International Journal of Mining Science and Technology, 27, 701–710.
Davies, M. 2001. Impounded mine tailings: What are the failures telling us? Canadian Mining and Metallurgical Bulletin, 94, 53–59.
Davies, M., Martin, T., Lighthall, P., 2000. Mine tailings dams: When things go wrong. In Tailings Dams 2000: Association of State Dam Safety Officials, U.S. Committee on Large Dams. Las Vegas, Nevada.
Edraki, M., Baumgartl, T., Manlapig, E., Bradshaw, D., Franks, D. M., Moran, C. J., 2014. Designing mine tailings for better environmental, social and economic outcomes: A review of alternative approaches. Journal of Cleaner Production, 84, 411–420.
EPA, 1994. Technical Report - Design and Evaluation of Tailings Dams, U.S. Environmental Protection Agency, Office of Solid Waste, Washington.63
GRIDA, 2016. Mine Tailings Storage: Safety is no Accident. A UNEP Rapid Response Assessment. United Nations Environment Programme and GRID-Arendal.
ICOLD, 2001. Tailings dam-risk of dangerous occurrences. Lessons learnt from practical experiences. Bulletin 121. Commission Internationale des Grands Barrages, Paris.
Jakka, R. S., Ramana, G., & Datta, M., 2011. Seismic slope stability of embankments constructed with pond ash. Geotechnique Geology Engineering, 29(5), 821-835.
Kasperski, K.L., Mikula, R.J., 2011. Waste streams of mine oil sands: characteristics and remediation. Elements, 7(6), 387-392.
Kemper, T., Sommer, S., 2002. Estimate of heavy metal contamination in soils after a mining accident using reflectance spectroscopy. Environmental Science & Technology, 36(12), 2742-2747.
Khamseh, A., Shahbazi, F., Oustan, S., et al., 2017. Impact of tailings dam failure on spatial features of copper contamination (Mazraeh mine area, Iran). Arabian Journal of Geosciences, 10(244).
Kossoff, D., Dubbin, W.E., Alfredsson, M., Edwards, S.J., Macklin, M.G., Hudson-Edwards, K.A., 2014. Mine tailings dams: Characteristics, failure, environmental impacts, and remediation. Applied Geochemistry, 51, 229-245.
Ledesma, O., Sfriso, A., Manzanal, D., 2022. Procedure for assessing the liquefaction vulnerability of tailings dams. Computers and Geotechnics, 144, 104632
Lei Y., Dai Q., Zhang B., Kong C., Yang J., 2022. A gradient smoothing technique-based S-FEM for simulating the full impacts of anomalies on seepage solutions and its application in multi-parameter seepage inversion. Water Resour Manage 38, 753–773.
Lottermoser, B., 2007. Mine Wastes: Characterization, Treatment and Environmental Impacts. Springer, Berlin,
Lyu, Z., Chai, J., Xu, Z., Qin, Y., Cao, J., 2019. A comprehensive review on reasons for tailings dam failures based on case history. Advances in Civil Engineering, 4159306.
Marcuson III, W.F., 1981. Moderator’s report for session on Earth dams and stability of slopes under dynamic loads. Proceedings of the International Conference on Recent Advances in Geotechnical Earthquake Engineering and Soil Dynamics, St. Louis, Missouri, 3, 1175.
Martin, T.E., Davies, M.P., 2000. Trends in the stewardship of tailings dams. In Proceedings of Tailings and Mine Waste 2000, 16 May 2022 London.
Management and Planning Organization of Iran, 2015. Guidelines for the design, construction, and operation of tailings dams. Regulation No. 682. [In persion]
Mendoza, O.T., Hernandez, M.A.A., Abundis, J.G., Mundo, N.F., 2006. Geochemistry of leachates from the El Fraile sulfide tailings piles in Taxco, Guerrero, Southern Mexico. Environmental Geochemistry and Health, 28(3), 243–255.
Morgenstern, R., Vick, S.G., Viotti, C.B., Watts, B.D., 2016. Fundão tailings dam review panel. Report on the immediate causes of the failure of the Fundão Dam.
Nabavi, M.H., 1976. An introduction to the geology of Iran. Geological Survey of Iran, 109 p. [In persion]
Naeini, M., Akhtarpour, A., 2018. Numerical analysis of seismic stability of a high centerline tailings dam. Soil Dynamics and Earthquake Engineering, 107, 179–194.
Niekerk, H.J.V., Viljoen, M.J., 2005. Causes and consequences of the Merriespruit and other tailings dam failures. Land Degradation & Development, 16(2), 201–212.
Nimbalkar, S.S., Annapareddy, V.S., Pain, A., 2018. A simplified approach to assess seismic stability of tailings dams. Journal of Rock Mechanics and Geotechnical Engineering, 10 (6), 1082-1090.
Ormann, L., Zardari, M.A., Mattsson, H., Bjelkevik, A., Knutsson, S., 2013. Numerical analysis of strengthening by rockfill embankments on an upstream tailings dam. Canadian Geotechnical Journal, 50(4), 391–399.
Ozer, A.T., Bromwell, L.G., 2012. Stability assessment of an earth dam on silt/clay tailings foundation: A case study. Engineering Geology, 151, 89–99.
Penman, A.D., (2001). Risk analyses of tailings dam construction. In Proceedings of the Conference on Safety of Mining Dams Seminar, Gällivare, Sweden.
Piciullo, L., Storrøsten, E.B., Liu, Z., Nadim, F., Lacasse, S., 2022. A new look at the statistics of tailings dam failures. Engineering Geology, 303, 106657.
Rico, M., Benito, G., Diez-Herrero, A., 2008. Floods from tailings dam failures. Journal of Hazardous Materials, 154(1-3), 79–87.
Shahriari, M., Aydin, M. E., 2017. Lessons learned from analysis of Los Frailes tailing dam failure. In International Conference on Applied Human Factors and Ergonomics. Springer, Cham, Switzerland.
Stark, T.D., Moya, L. and Lin, J., 2022. Rates and causes of tailings dam failures. Advances in Civil Engineering, p.7895880.
Toosab Consulting Engineers, 2018. Final report on geology and engineering geology of the raising of Mazraeh tailings dam. Report No. 7781-410481. [In persion]
Toosab Consulting Engineers, 2018. Seismicity, seismotectonics, and earthquake hazard report of the Mazraeh tailings dam. Report No. 7771-410481. [In persion]
Toosab Consulting Engineers, 2019. Design report of the foundation and body of Mazraeh copper mine tailings dam (raising up to elevation 2085 m). Report No. 7954-410481. [In persion]
United States Environmental Protection Agency (UNEP)., 1994. Technical report: Design and evaluation of tailings dams. U.S. Environmental Protection Agency, Office of Solid Waste, 68 p. 
Vandeberg, G. S., Martin, C. W., Pierzynski, G. M., 2011. Spatial distribution of trace elements in floodplain alluvium of the upper Blackfoot River, Montana. Environmental Earth Sciences, 62, 1521–1534.
Vick, S.G., 1990. Planning, design, and analysis of tailings dams. Wiley, New York, 369 p.
Washington State Department of Transportation (WSDOT)., 2010. Standard specifications for road, bridge, and municipal construction (M 41-10). Construction Administration Office, Engineering and Regional Operations Division, 220 p.
WISE (World Information Service on Energy), 2024. Chronology of major tailings dam failures. Online since. 
WISE (World Information Service on Energy Uranium Project), 2012. Chronology of major tailings dam failures. Online since. 
Yu, D., Tang, L., Chen, C., 2019. Three-dimensional numerical simulation of mudflow from a tailings dam failure across complex terrain. Natural Hazards and Earth System Sciences, 20(3), 727–741.
Yu, H., Zahidi, I., Fai, C.M., Liang, D., Madsen, D.Ø., 2025. Tailings dam failures: A critical evaluation of current policies and practices. Results in Engineering, 25, 103973.
Zardari, M.A., Ormann, L., Mattsson, H., Knutsson, S., 2014. Numerical analysis of staged construction of an upstream tailings dam. In Proceedings of National Conference on Civil Engineering. Department of Civil Engineering, QUEST Nawabshah, Pakistan.